VisiTractm Real Time Monitor (RTM) Component
Version 8.0
The current release of VisiTrac/RTM is 8.0
Quick links on this page:
- What is VisiTrac/RTM?
- Who Needs RTM?
- The Active RTM Displays
- How does VisiTrac/RTM Work?
- Request a Detailed Product overview
What is VisiTrac/RTM?
VisiTrac/RTM provides a real time view of your processes as they execute. The product is distributed as an add-on component of the VisiTrac/Basic product. VisiTrac/RTM uses the download (report) file produced by the basic product as input to any monitoring session.
VisiTrac/RTM builds on the historical reports created by VisiTrac/Basic by allowing the user to directly monitor an active process as it runs. The key requirement for the basic product is to provide RTM with a model of how the process normally executes. RTM uses the model flowchart to predict future timings of tasks not yet run based on the average start and run times as calculated by the VisiTrac/Basic product.
The base product provides extensive criteria to identify not only individual process collections of jobs, but also specific instances of each process based on when and/or how any particular instance of a process executes. This ability to distinguish versions of the same process allows VisiTrac to provide a highly accurate model of how any version normally runs.
VisiTrac/RTM uses the same desktop interface as the basic product, but enhances the information presented with real time status. Status is reported at both the task and overall process level with constant updates to the predicted end time of the entire system of work.
At the process level the product constantly updates the expected end time of the overall collection of tasks. If a Target End Time is provided then RTM will also grade the current execution, comparing the predicted end time to the desired target end time and summarize status as on-time, in jeopardy or late.
The basic flowchart view is augmented by adding status changes like waiting, running, stalled and finished with any basic exception status.
A powerful additional status provided at both the process and task level of display is the concept of work being stalled. A stalled process is one where some critical path task has been waiting longer than a user defined threshold after all dependencies have been resolved. Stalled processes are noted on the process-level display. The stalled task is specifically identified on the flowchart view.
Click here to request a detailed product overview.
Who Needs RTM?
VisiTrac/RTM is ideal for:
- Operations Control Managers who need to track their workloads as they run with status reporting that might prompt them to adjust resource allocation to help a troubled process meet its SLA goal.
- Performance Technicians who want to be quickly notified of troubled processes while they're running, not the day after.
- Upper-Management who needs a quick view of process status as they run
- Customers and Application programmers engaged in monitoring workload, perhaps as it runs new software and/or conducts altered processing.
- Customers of outsourcing firms who need their own tools to monitor the outsourcing company's performance as it happens.
The Active RTM Displays
VisiTrac/RTM provides a real-time view of your processes as they transition from waiting, to running, to finished status. Along the way the monitor is constantly posting status updates, re-calculating the critical path and maintaining a constant prediction of the ultimate process-level end time.
There are two primary displays provided with constant process updates. These displays are essentially the same displays seen in the basic product, but enhanced with real-time status updates and some additional, active status details.
- Active Process Status Display
The Active Process Status display provides one line per process in the download file. As each process transitions from a waiting status to a running status and on to a finished state, this display provides high-level status updates designed to keep you informed on the condition of any process you're monitoring. - Active Task Flowchart
The Task Flowchart is the same flowchart seen in the basic product. However, it is augmented with the active posting of individual task status as tasks migrated from a waiting status, to a running status, to a completed status. All along the VisiTrac modeling engine posts updates to the present critical path of the process and its overall, predicted end time.
Click here to request detailed examples of these reports.
How does VisiTrac/RTMtm Work?
VisiTrac/RTM is an add-on component to our VisiTrac/Basic product -- version 8.0 and later. VisiTrac/RTM uses process data produced by the basic product to initiate the monitoring of any active process, real time, as it runs.
The RTM component relies on the Basic product's output for a guide to how the process usually runs. It then integrates this "road map" with real time execution data collected from system monitoring agents running on each batch processing server. Active reports on process status are displayed through the same desktop viewer delivered with the VisiTrac/Basic product so use of the add-on component is intuitive and fully integrated.
